Get a quote
Services / Industrial

Industrial estimating services

Structural and trade estimates for warehouses, manufacturing facilities, and tilt up construction, with steel takeoffs handled in house.

Steel and structural takeoffs done right

Industrial projects live and die on structural accuracy. A missed steel connection or an underestimated rebar count can wipe out a bid's margin. Our industrial estimates are cross checked against structural drawings before delivery, with quantities broken down by member type and connection detail.

We support warehouses, manufacturing facilities, distribution centers, and tilt up construction, with a standard turnaround of 24 to 48 hours. For large span structures, we pay close attention to connection hardware and bracing, which is often where quantities get underestimated on a rushed takeoff.

If your project involves a specialized structural system, send us the engineer's drawings along with the architectural set, so nothing gets missed between the two.

Get a quote
What's included

Every industrial estimate covers

Structural steel

Beams, columns, connections, and steel tonnage by member type.

Concrete and rebar

Tilt up panels, slabs, footings, and reinforcement schedules.

Roofing and envelope

Metal panel systems and insulation for large span roofs.

Site and paving

Heavy duty paving, loading dock areas, and site utilities.

Our process

From structural drawings to a checked estimate

01

Submit drawings

Architectural and engineered structural drawings for the facility.

02

Scope confirmed

We confirm which trades are included in your bid scope.

03

Structural cross check

Steel and concrete quantities are reviewed a second time before delivery.

04

Delivered in Excel

Your estimate arrives broken down by member type and trade.

Industrial estimating questions

Yes, we break down connection hardware separately from primary steel tonnage, since connections are a common place for quantities to be underestimated.

Yes, send the structural engineer's drawings along with the architectural set and we will estimate directly from both.

Yes, panel counts, rebar schedules, and lift hardware are estimated as part of the concrete scope for tilt up projects.

Have an industrial project to bid

Send your plans today and get pricing back within 24 to 48 hours.

Get a quote
Scan the code
Powered by Joinchat